![]() Connecting the walking trail to other areas of the park and installing bridges over waterways on the trail. Leveling the soccer field and renovating the softball and baseball dugouts as well as installing new fencing. Renovating the existing playgrounds areas and adding another tactical-inspired play space that would connect all three. The pavilion would also be winterized so the space could be utilized year-long. The renovations would include the addition of a large deck and large glass garage-like doors that could retract to blend the indoor and outdoor spaces as well as a handicap-accessible bathroom that could be accessed from inside the building and installing a sidewalk. ![]() Adding additional parking near the baseball field and the brick pavilion.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |